View larger map

© OpenStreetMap contributors

Cheongju, South Korea – Gangseo

Tesla Supercharger
Gaposan-ro 19128381 Cheonju-si, South Korea
Directions

Charging points

OPEN TO ALL EVs
250 kW CCS112 stalls
  • Stall 1
  • Stall 2
  • Stall 3
  • Stall 4
  • Stall 5
  • Stall 6
  • Stall 7
  • Stall 8
  • Stall 9
  • Stall 10
  • Stall 11
  • Stall 12

Live stall availability isn't available yet. Stall counts come from supercharge.info and OpenStreetMap.

Photos

Nearby

Everything here is a short walk from the stalls.

  1. 대산보리밥 Restaurant · 1 min walk30 m
  2. 하늘가청주점 Restaurant · 1 min walk80 m
  3. 순천만꼬막집 Restaurant · 1 min walk80 m
  4. 본궁석갈비 Restaurant · 1 min walk90 m
  5. 한상 Restaurant · 1 min walk90 m
  6. 신전떡볶이 Restaurant · 7 min walk540 m

About this Supercharger

This Tesla Supercharger at Gaposan-ro 191 in Cheonju-si, South Korea has 12 stalls that charge at up to 250 kW through CCS1 connectors. A typical stop to top up takes about 20 to 40 minutes.

While you charge, you can walk to 6 places to eat within about 8 minutes, including 대산보리밥, 하늘가청주점 and 순천만꼬막집. The closest is 대산보리밥 (restaurant), a 1-minute walk away. For coffee, 레인디어 is a 1-minute walk away. You'll also find one shop nearby.

The nearest other Supercharger is Cheongju, South Korea – Cheongwon, about 8.9 km away in a straight line.

Map data © OpenStreetMap contributors
Station data: supercharge.info
Places: OpenStreetMap contributors, Overture Maps Foundation
Not affiliated with Tesla, Inc.