Bad Oeynhausen, Germany
Charging points
OPEN TO ALL EVs250 kW CCS212 stalls
- Stall 1
- Stall 2
- Stall 3
- Stall 4
- Stall 5
- Stall 6
- Stall 7
- Stall 8
- Stall 9
- Stall 10
- Stall 11
- Stall 12
Live stall availability isn't available yet. Stall counts come from supercharge.info and OpenStreetMap.
Photos
Nearby
Everything here is a short walk from the stalls.
About this Supercharger
This Tesla Supercharger at Mindener Str. 22 in Bad Oeynhausen, Germany has 12 stalls that charge at up to 250 kW through CCS2 connectors. A typical stop to top up takes about 20 to 40 minutes.
While you charge, you can walk to 10 or more places to eat within about 8 minutes, including Burger King, Weserhütte Pizzeria and Glückspilz. The closest is Burger King (fast food), a 1-minute walk away. For coffee, Meyerbeer Coffee is a 2-minute walk away, one of 4 cafés nearby. E Center (grocery store) is a 2-minute walk away if you need snacks or drinks. You'll also find 10 or more shops and one bar or pub nearby.
The nearest other Supercharger is Herford, Germany, about 14 km away in a straight line. There are also 8 other EV charging stations within about 1.5 km, 2 of them DC fast chargers.